1 BID TAB – CERTIFIED FROM OA

Posted on: October 9th, 2017 by dhoward
1 BID TAB - CERTIFIED FROM OA , 1-BID-TAB-CERTIFIED-FROM-OA.pdf (0.2 MiB)

1 SIGN IN SHEET

Posted on: October 6th, 2017 by dhoward
1 SIGN IN SHEET , 1-SIGN-IN-SHEET.pdf (0.2 MiB)

1 BID TAB – NOT CERTIFIED

Posted on: October 6th, 2017 by dhoward
1 BID TAB - NOT CERTIFIED , 1-BID-TAB-NOT-CERTIFIED.pdf (0.3 MiB)

Addendum 1-East Bay Park Improvements – Recreational Trail 8.30.2017

Posted on: August 30th, 2017 by dhoward
Addendum 1-East Bay Park Improvements - Recreational Trail 8.30.2017 , Addendum-1-East-Bay-Park-Improvements-Recreational-Trail-8.30.2017.pdf (0.3 MiB)

Sign In Sheet Mandatory Pre Bid Meeting 2017

Posted on: August 23rd, 2017 by dhoward
Sign In Sheet Mandatory Pre Bid Meeting 2017 , Version 08.23, sign-in-sheet-mandatory-pre-bid-meeting-2017.08.23.pdf (0.9 MiB)

Bid Drawings From OA 2017

Posted on: August 3rd, 2017 by dhoward
Bid Drawings From OA 2017 , Version 08.02, bid-drawings-from-OA-2017.08.02.pdf (3.9 MiB)

Ad

Posted on: August 1st, 2017 by dhoward
Ad , ad.pdf (42 KiB)

Project Manual Final

Posted on: August 1st, 2017 by dhoward
Project Manual Final , Project-Manual-final.pdf (0.4 MiB)
Georgetown